IP
Generate
Spanish UPS outlet wiring infographic preview image
Primary reference image
gpt-image-2 case其他灵感Image to Image1 ref

Spanish UPS outlet wiring infographic

This prompt turns a reference photo of a UPS into a labeled Spanish instructional diagram showing which sockets to use for critical equipment and where to move the switch.

This is a gpt-image-2 prompt case for 其他灵感. Use the copy-ready prompt below to generate similar visuals, and review Awesome Nano Banana Pro Prompts attribution plus commercial-use rights before reuse.

Need the full prompt set? Use the 其他灵感 topic hub for more related examples, or open the GPT Image 2 prompt library for the full example index, reusable structures, and source attribution.
Try this prompt

Prompt

Copy-ready prompt

Using the provided APC Back-UPS reference image, convert it into a clear Spanish-labeled setup guide and overlay it directly onto the photo. Keep the UPS photo true and unchanged as the base image, but add color-coded labels to show which outlets are for battery backup and which only provide surge protection. Add two title boxes at the top: a dark gray box on the left with the text "SOLO PROTECCIÓN (sin batería)" and a green box on the right with the text "CON BATERÍA (recomendado para equipos críticos)". Highlight the four outlets on the right with a green outline group and individual green outlines, and place four numbered green labels on the right: "1 Servidor 1", "2 Servidor 2", "3 Servidor 3", "4 Switch (mover aquí)". On the left, highlight the currently used top-left outlet with an orange outline and add an orange label box with the text "Switch: mover de aquí", along with a curved arrow from that outlet to the bottom outlet in the green group on the right. In addition, the three sockets in the lower left corner are outlined in light gray, and three gray labels are added to the left: “Solo protection (sin batería)”, “No crítico”, and “Libre / periféricos”. At the bottom, a large yellow warning box with a warning icon is added, with the text: “Ojo: 3 servidores + 1 switch pueden sobrecargar un Back-UPS ES 700. Si pita o se apaga al probarlo, necesitas un SAI más potente.” The design adopts a clean infographic style, using clear and easy-to-read bold typography, neat rounded rectangles, high contrast, and practical IT chart presentation.

More cases in this category

Prioritized by category, input mode compatibility, quality, and lower risk.

6

Reuse and source notes

Use this prompt safely after previewing the case.

  1. 1.Copy the prompt or open it directly in Dovoo with the generation button.
  2. 2.Adjust variables, aspect ratio, and reference images for your own use case.
  3. 3.Before publishing or paid usage, verify source rights, attribution requirements, and brand or likeness risks.

Can I use this prompt commercially?

Commercial-use status is restricted. Review the original source, license, brand constraints, and legal requirements before paid usage.

Where does this case come from?

This case is imported from Awesome Nano Banana Pro Prompts; keep attribution visible and check the source URL before reuse.

Spanish UPS outlet wiring infographic for GPT Image 2 | Image Prompt Gallery